FICTIONAL PURSUIT EXAMPLE Authored fictional example, not a live product capture or customer result. A county is selecting an engineering team for stormwater improvements along existing roads. Its fictional RFQ requires three comparable projects completed within five years, the proposed manager’s responsibilities and availability, and an approach to drainage design around existing utilities and access constraints. SOURCE RECORDS R1 — County RFQ · sections 3.2–3.4 A county is selecting an engineering team for stormwater improvements along existing roads. Its fictional RFQ requires three comparable projects completed within five years, the proposed manager’s responsibilities and availability, and an approach to drainage design around existing utilities and access constraints. P1 — Hickory Lane drainage improvements · 2023 project sheet Completed drainage design along an existing neighborhood road. The firm designed replacement storm drains and inlets, coordinated utility conflicts, and developed construction phasing to maintain driveway access. Maya Chen is listed on the team, but her responsibilities are not recorded. P2 — Westgate culvert replacement · 2024 project sheet Completed culvert replacement design beneath an existing county road. The firm coordinated utility crossings, temporary traffic arrangements, and drainage tie-ins. The approved project sheet and client reference are available. P3 — Cedar Run drainage retrofit · 2022 closeout record Completed drainage retrofit design within an existing road corridor, including utility coordination and property-access constraints. At initial qualification, this record is still with the project lead; the proposal library contains only a short project listing. P4 — Eastfield development · 2024 project sheet A larger greenfield subdivision drainage project. It demonstrates drainage design experience, but not work around an operating road’s existing utilities and access constraints. E1 — Hickory Lane project principal · confirmed role Maya was drainage design lead. She coordinated the utility-conflict review and developed the access-phasing drawings. The principal retained overall project management. Maya’s pursuit résumé is updated to describe that role accurately. C1 — Practice leader · capacity confirmation The practice leader confirms Maya’s availability for the anticipated assignment after reviewing her existing commitments. Any change to the assignment schedule requires a fresh capacity check. D1 — Pursuit principal · approved direction After P3, E1, and C1 are confirmed, approve the pursuit using Hickory Lane, Westgate, and Cedar Run. Lead with existing-road constraints, not contract size. Propose an early review of drainage tie-ins, utility conflicts, and access requirements with the county. The final statement of qualifications still requires review and approval. EXPERT QUESTION On Hickory Lane, which drainage-design activities did Maya personally lead, and which responsibilities remained with the project principal? Confirm the wording we can use in her pursuit résumé. RESPONSE EXCERPT Hickory Lane, Westgate, and Cedar Run each involved drainage improvements within existing road corridors. Across these projects, our team addressed utility conflicts, drainage tie-ins, and property-access constraints relevant to your assignment. [P1, P2, P3] At Hickory Lane, proposed project manager Maya Chen served as drainage design lead, coordinating the utility-conflict review and developing access-phasing drawings. For your assignment, we propose an early review of drainage tie-ins, utility conflicts, and access requirements with county staff before advancing the design. [E1, D1] ADDENDUM Addendum 1 §1 — Revised team form Replace Team Form A with Team Form A (Rev 1), which adds a field for the proposed project manager’s availability. The requirements in §3.3 remain unchanged. Addendum 1 §2 — Acknowledgment Acknowledge Addendum 1 in the submission checklist. All other instructions remain unchanged. REOPENED WORK M02 — Manager responsibilities and confirmed availability Reopened: Carry C1 into the revised form and have the practice leader check consistency before approval. M03 — Use the revised team form Open: Replace the original form, complete the new field, and check the final attachment set. M04 — Acknowledge Addendum 1 Open: Confirm the acknowledgment in the assembled submission before final approval.